Demolition Ex Berera area
After 2001 activity has been shut down and we proceeded with the following work in accordance with local environmental authorities: asbestos roofs removal soil clean-up and total demolition of the structures. Main buildings consisting of: steel structures 12 m in height with masonry wall. |
![]() |
![]() |
![]() |
![]() |