DITTA GIAMBELLI
clean up of former SAN GIORGIO dairy factory
Locate Triulzi (MILAN)

Clean up was performed on all structures and installations. Before demolition of pipework and tanks the following operations were carried out: Installation shut down and elimination of all fluids from pipework and sludge from tanks of the water treatment plant. High pressure washing of all walls. Demolition work of all structures (r.c.) present on site was performed mainly by use of an hydraulic crusher.